Skip to content
System Online
--:--:--
Live Feed
AwardConcrete Poured Right named Concrete Report Recommended for Greater Cincinnati residential concrete: commercial-grade standards brought home to Loveland.SpotlightCincinnati Site Solutions: Eleven years of owner-led flatwork serving Greater Cincinnati, and a Concrete Report Recommended designation.BriefCold-weather placement window opens across the Upper Midwest, curing plans under review.SpotlightMeridian Structural Concrete on running two tower mats in a single quarter.Bid DeskSample opportunity posted: 240,000 sq ft distribution slab, Columbus metro.MaterialsPortland-limestone cement adoption keeps reshaping mix submittal packages.TechnicalNew field notes: joint layout strategies for wide-bay superflat floors.WorkforceFinishing crew retention: what contractors report actually works.AwardConcrete Poured Right named Concrete Report Recommended for Greater Cincinnati residential concrete: commercial-grade standards brought home to Loveland.SpotlightCincinnati Site Solutions: Eleven years of owner-led flatwork serving Greater Cincinnati, and a Concrete Report Recommended designation.BriefCold-weather placement window opens across the Upper Midwest, curing plans under review.SpotlightMeridian Structural Concrete on running two tower mats in a single quarter.Bid DeskSample opportunity posted: 240,000 sq ft distribution slab, Columbus metro.MaterialsPortland-limestone cement adoption keeps reshaping mix submittal packages.TechnicalNew field notes: joint layout strategies for wide-bay superflat floors.WorkforceFinishing crew retention: what contractors report actually works.
Editorial category

Equipment and Technology

Pumps, pavers, screeds, trowels, laser and GPS control, sensors and telematics.

What this category covers

Equipment decides how fast concrete can be placed well. This category covers boom pump selection and setup, laser screed economics, ride-on trowel practice, slipform paving control, GPS grade control, maturity and temperature sensing, and the maintenance discipline that keeps a placement from stopping.

Current coverage

  • Business of the tradeUpdated this quarter

    Laser screed economics on mid-size slab packages

    Reported by the Concrete Report editorial desk and reviewed by working practitioners before publication.

  • Field guideUpdated this quarter

    Pump setup, reach and the standby machine question

    Reported by the Concrete Report editorial desk and reviewed by working practitioners before publication.

  • TechnicalUpdated this quarter

    Maturity sensors and earlier, safer stripping decisions

    Reported by the Concrete Report editorial desk and reviewed by working practitioners before publication.

  • Field notesUpdated this quarter

    GPS grade control on site preparation work

    Reported by the Concrete Report editorial desk and reviewed by working practitioners before publication.

Coverage in this category is published on a rolling basis. Subscribe to The Pour on the resources page to receive new pieces as they run.

Related project intelligence

Case studies touching this category

  • 240,000 sq ft distribution slab, defined-traffic aisles

    240,000 sq ft distribution slab, defined-traffic aisles

    Aisle values reported by aisle within 72 hours of each placement; no joint reconstruction required.

  • 3,100 cubic yard tower mat with thermal control

    3,100 cubic yard tower mat with thermal control

    Differential held within specification; superstructure released to a five-day deck cycle.

  • 286-panel tilt-up campus envelope

    286-panel tilt-up campus envelope

    Erection completed on the staggered crane plan without a re-cast panel.

Keep reading

Sitemap
FindPost projectGet listed