Site preparation
Clearing, cut and fill, moisture conditioning and a subgrade that will not move.
- Strip organics and unsuitable material before grading
- Moisture-condition fill within the specified range
- Document acceptance before forms go in
Fourteen practice areas, written for the people who place, finish and stand behind the work. Each area covers what decides the outcome and what most often goes wrong.
Clearing, cut and fill, moisture conditioning and a subgrade that will not move.
Lift thickness, equipment match and density verification.
Getting water away from concrete before it becomes a durability problem.
Bar size, spacing, cover, support and load transfer at joints.
Pressure, bracing, tie layout, release and stripping sequence.
Balancing strength, durability, placeability and schedule.
Delivery rhythm, consolidation and the plan for a delivery gap.
Timing bleed water, float and trowel passes to the surface required.
Control, construction and isolation joints placed to a plan.
Retaining moisture and controlling temperature during strength gain.
Temperature limits, protection and adjusted expectations.
Reading cracking, scaling, discoloration and surface defects.
Sampling, cylinders, slump, air content and in-place methods.
The documentation that turns a good pour into a defensible record.
Every case study in Project Intelligence documents the technique decisions behind a real scope: mix strategy, reinforcement, execution and result.
240,000 sq ft distribution slab, defined-traffic aisles
Portland-limestone cement mix with reduced water demand; fibers omitted in favor of dowelled joints for aisle stability.
Granite Line Flatwork
3,100 cubic yard tower mat with thermal control
High-supplementary-cementitious mix with retarding admixture and ice substitution for batch water.
Meridian Structural Concrete
286-panel tilt-up campus envelope
Panel mix designed for early lift strength with evaporation retarder during finishing.
Sunbelt Tilt Partners